Project history · 2005–2011

The rainwater-catchment years.

On our first trip in 2005, rainwater seemed like the answer. We helped families collect it from their roofs and store it in tanks. From 2005 to 2011, that was our only water solution. Then the dry months pushed us to look for something more dependable.

Family and volunteers beside a water system
A family and project volunteers beside an installed water system.
01

Starting with rainwater

We began with gutters, pipes, and storage tanks. Volunteers helped bring the materials to island communities and put the systems together. Catching rain brought water closer to home, but it also taught us how much the seasons mattered.

02

Cost and the dry season

The systems were expensive to buy, transport, and build. They worked during about nine rainy months of the year. During the three dry months, the rain stopped and stored water could run short. Families needed a source they could turn to when the tanks were no longer enough.

03

Questions that led to wells

At Rotary presentations, someone almost always asked, “What about a well?” At first, we pictured a huge drilling rig that could never reach these roadless islands. More questions led to more research, and we found Hydromissions. Its portable hand auger made a well possible. In 2011, their team helped us drill our first one.

04

How that experience shapes the program today

We still carry those lessons into every well: listen to the families, work with the materials we can get, and keep improving what does not work well enough. Rainwater catchment was where we began. It set us on the path to the wells and repairable hand pumps we build today.

From the field

Photographs from the project

Open the photograph to see the detail.

Roof installation for rainwater collection
A roof becomes part of the systemPreparing roofing for a rainwater catchment installation.
Archive source0 Water Catchment\0_InstallingZincRoof.jpg
Installing a gutter on a roof
Guiding rain toward storageGutters carry roof runoff toward a storage tank.
Archive source0 Water Catchment\on roof installing gutter for catchment system.JPG
Team members carrying a water tank
Getting materials to the siteTransporting a water tank is part of the work before installation.
Archive source0 Water Catchment\Hauling tank up the narrow and steep mountian trail.JPG
Team members positioning a water tank
Placing the tankA tank is positioned for a rainwater catchment system.
Archive source0 Water Catchment\0_PlacingTank.JPG
Boat loaded with tanks, PVC and a ladder
The journey is part of the workTanks, gutter materials and a ladder travel with the team by boat.
Archive source0 Water Catchment\team loaded in boat with tanks, pvc for gutters and ladder.JPG

From the field

Watch the work

Original field recording. Titles and written summaries are available in both languages.

Installing catchment gutters

Gutter installation for a rainwater catchment system.

About this recording

Original field recording. Titles and written summaries are available in both languages.

Audio is presented in the language originally recorded.

Give water

Help the next family build a well.

Your gift to The Healing Fund helps buy PVC and the supplies we use to build wells and pumps. Hydromissions covers Simón’s salary, fuel, and other operating costs. Volunteers pay their own way.

When donating, select “Water Projects”.

Give through Hydromissions

Giving is completed on our partner Hydromissions’ website.

Download JPG